Crozier-Plex Pedestrian Connector
Construction project timeline: Spring 2025-Fall 2025
Identified several years ago in a pedestrian safety study focused on minimizing pedestrian-vehicular conflict, the Crozier-Plex project has been a priority in the College’s two most recent master plans (1999, 2018). This project will take place in four phases and will involve the removal of the roadway and parking between Cro and the Plex to more effectively link these two buildings creating a unified campus open space. As a result of this project, parking will be redistributed throughout the campus creating enabling parking projects.
Phase 1: Enabling Parking Lot
Phase 2: Cro Boulevard
Phase 3: Enabling Parking Lot TBD
Phase 4: Crozier-Plex Pedestrian Connector
Read more